Incremental Launching

The construction method of pre-stressed concrete deck bridge, by incremental launching, is performed by the execution of successive sections of the deck bridge in a prefabricated area located at one end of the work to be performed.

SERVICES PROVIDED

  • Consulting and researching of Construction methods;

  • Coordination and monitoring work;

  • Technical assistance;

  • TurnKey service concept;

  • Supply of a Traveller for the Internal Formwork;

  • Oil-Hydraulic systems of the Formwork and pushing devices;

  • Scaffolding and Working Platforms;

  • Instrumentation and Control System from the pushing device;

  • Specialized labour

 

PORTFOLIO


THE OTHER SIDE IS CLOSER