N25 New Ross Bypass
River Barrow Bridge
CLIENT
N25 New Ross Bypass JV
CITY
Kilkenny, Republic of Ireland
TECHNOLOGICAL SOLUTION
Climbing Formwork
DESCRIPTION

The 25km Bypass in Ireland includes the NEW ROSS BYPASS PPP SCHEME N25 bridge over the Barrow River, with this project aiming to improve connectivity between regions nationally and internationally. CONSTRUGOMES is responsible for the execution, handling and installation of formwork and reinforcement, for concreting and finishing. The supply of qualified manpower in the area of safety and engineering is also part of the scope of CONSTRUGOMES.

TECHNICAL SOLUTION:

  •  Pylons built with climbing formwork;
  •  Access viaduct decks built using the heavy propping "MK solution";

TECHNICAL FEATURES:

  • PYLONS MAXIMUM HEIGHT | 60m
  • FULL LENGTH | 880m
  • MAXIMUM SPAN BETWEEN PYLONS (MAIN BRIDGE) | 230m
  • MAXIMUM SPAN BETWEEN PYLONS (ACCESS)| 95m
  • WIDTH | 22m
  • SEGMENT | 5m
  • Nº OF SPANS | 9